Bench Bolt

More from the desk

Running a bench alone means you are also the manager. These pieces pick up where that thought usually leads: what your hour is worth, how a quote and a deposit should be written down, and what to do when a supplier goes quiet after the money moves.

All columns and field notes

Pricing

Pricing Your Own Labour When You Work Alone

A plain method for quoting repair and craft jobs without guessing: real hours, materials markup, travel to collect parts, and the cost of a redo. It also shows why a deposit is normal and how to word one in a short written quote.

Admin

Invoicing, Permits and Suppliers Who Disappear

A written quote, a deposit record, an invoice with the right details, and a note of what was agreed. The piece sets out a simple system that fits in one folder, and the practical steps that help when a supplier takes a deposit and stops answering.

Sourcing

Sourcing Parts Around Johannesburg's Industrial Edges

Which spares shops keep dusty stock, which scrap yards let you dig, and which market stalls sell by the piece. How to ask for a part, what to bring, and how to judge whether a used component is worth the risk.

Two more that pair well with the manager's side of the bench: Setting Up a One-Meter Repair Bench in a Small Room and What Actually Wears Out First on Hand Tools.

What running the bench alone actually asks of you

When you are the maker, the bookkeeper and the buyer, the job is not only the work in front of you. These are the parts that decide whether the month holds together.

Bench Bolt: managers
  • Know your own hour

    Build a rate from the hours a job really takes, not the hours you hope it takes. Materials, travel to collect parts and the odd redo all belong in the number before you say yes.

  • Quote in writing, briefly

    A short written quote that names the work, the parts and the deposit settles most arguments before they start. It also gives you something to point at when the scope quietly grows.

  • An invoice a customer can pay

    Your name, the job, the agreed amount, the deposit already received and how to pay. Keep it to one page and keep a copy. That single habit removes most follow-up calls.

  • One folder for the paper trail

    Quotes, deposit records, parts receipts and notes on what was agreed. Physical or digital, it only works if it is one place you actually open, not five you forget.

  • A rule for spending first

    Decide in advance how much you will pay out before a job is confirmed. A written order and a follow-up habit make the supplier problem far less painful when a part never arrives.

  • Permits and basics, in plain words

    The admin side is rarely exciting, but it is what keeps a one-person operation standing. Plain-language notes on permits, invoicing and supplier terms sit alongside the bench work.

If a supplier has gone quiet after a deposit, the paper trail matters most. The admin notes in the posts desk walk through quotes, deposits and follow-ups, and the contact page is where you send your own workshop story or tip.